Moment Group

     Job Opportunity           Contact Us

Technical Information

Mechanical Splicing

Moment BarBreak Coupler

BarBreak Connection Splice

Seismic Design

Post Tensioning

Control Permeability Formwork (CPF)

 

Job Opportunity
Contact Us
Moment
R
o
Mechanical Splicing
Moment BarBreak Mechanical Splicing System
Moment Patented "Barbreak' Connection
Connection and Seismic Design
Post Tensioning
CPF  Liner

Typical Problems

Usually where traditional formworks are used, the concrete surfaces are weak due to substantial loss of cement content, raised W/C ratio and contamination by the form release agents. These surfaces tend to yield and dust easily at low impact. Blowholes and all sorts of blemishes in the surface are rampant, profoundly lowering the service life of the structures.

CEM-liner cast concrete provides remarkable benefits as follows;

Previous Page
Next Page.
CPF FAQ
CPF  Liner
Technical Information  >>   Control Permeability Formwork (CPF)